BFT ARES VELOCE SMART BT A500 120V 60HZ Slide Gate Operator

BFT ARES VELOCE SMART BT A500 120V 60HZ Slide Gate Operator
BFT

A high-speed BFT ARES VELOCE SMART BT A500 slide gate operator on 120V 60Hz, rated for intensive use. Fast opening reduces wait times and closes quickly to cut the risk of tailgating. Includes BFT's MERAK BT A V control unit, a lever release with a personalized key, IP24 protection, and a -4°F to 131°F operating range at 400W. Ideal for busy commercial entries in DFW — Noble Fence & Gate handles installation.

SKU: BFT-P926198-00001Category: Slide Gate OpenerEquipment from: $3,120.99

Call for pricing & professional installation — we supply and professionally install across Dallas–Fort Worth, Texas.

Installed by Noble in Dallas–Fort Worth

We size, supply, and install this equipment as part of a complete gate or access project — including wiring, safety devices, and programming. Learn more about our automatic gate & access services or check our service areas.

Specifications

  • Speed: The fast opening of the ARES SMART BT reduces waiting times and allows quicker access, reducing the risk of an accident.
  • Security: The fast operating speed means that the ARES VELOCE SMART BT A closes quickly, reducing the risk of entry by unauthorized people.
  • Personalised key: The lever release makes it easy to release the motor, and the personalized key is unique, providing increased security.
  • Control unit: MERAK BT A V
  • Frequency of use: Intensive
  • Board power supply: 120 V
  • Protection rating: IP24
  • Environmental conditions: -4 - 131°F (-20 - 55°C)
  • Power consumption: 400 W
  • Pinion module: 0.16"/4mm (25 teeth)
  • Speed without load: no
  • Max. door/gate weight: 1102 lbs (500 kg)
  • Max torque: 20 Nm
  • Impact reaction: 8K2 safety edge (not supplied)
  • Locking: Mechanical
  • Manual cycle: Mechanical release with lever
  • Interconnectivity: Yes
  • Slowdown: Yes

More in Slide Gate Opener

Let’s make
room for your plans.

A new boundary. A better entrance. A repair that’s overdue.
Tell us what you’re thinking.

Call NobleRequest an estimate